Rest breaks

PIC_0016

PIC_0017

Preparation for plaster works

PIC_0109

PIC_0110

In progress

01 Vlad makes a solution

Roughing buckle under the warm floors in the Hole

Roughing buckle under the warm floors in the Hole

03

04

05

06

buckle in the corridor

buckle in the corridor

PIC_0077

PIC_0078

Thank you guys from Tula in the sand and cement

02-02-10_1343

02-02-10_1350

December 30, we earned the first bathroom on 2 nd floor

dushevaya1

dushevaya2

dushevaya3

dusheva4

dushevaya5

We replenishment!

This Amega (labradobr:) - a gift from Oli from s.Holmskoy, Krasnodar Territory

This Amega (labradobr:) - a gift from Oli from s.Holmskoy

Amega2

Seva from Rostov built Amega house

Seva from Rostov built Amega house

budka2

Construction continues

Thanks to Natasha and Andrew from Germany, as well as Alexei and brothers from Tula for assistance in acquiring materials

Thanks to Natasha and Andrew from Germany, as well as Alexei and brothers from Tula for assistance in acquiring materials

adhesive for tiles and cement, now have something to work with Sergei

adhesive for tiles and cement, now have something to work with Sergei

bathroom in the Rostov (to repair the guys from Rostov) room

bathroom in the Rostov (to repair the guys from Rostov) room

When not enough guys for the work come from girls

Izobrazhenie2 035Izobrazhenie2 040

Izobrazhenie2 039

Izobrazhenie2 045

Izobrazhenie2 055

Well. Another sewn plasterboard ceiling

Well. Another sewn plasterboard ceiling

after work cleaning

after work cleaning

Glued the first tile in the bathroom

Preparation

Preparation

Izobrazhenie2 064

Sergei Rostov sticks from the first tile in the house!

Sergei Rostov sticks from the first tile in the house!

Izobrazhenie2 066

For two tiles

For two tiles

Happy Birthday!

our birthday boy, Vladimir L.

our birthday boy, Vladimir L.

Izobrazhenie2 050Izobrazhenie2 048