






installing pump

Polystyrene 35 density


reflective striping

laying of heating pipes





sticking baguettes

sticky steklooboyami



Very close were groundwater
began preparation of data for concrete pouring, but had to be postponed. The water is very much began to arrive, waiting for when the water level decreases
While our drain hole is more like a swimming pool. We pray, we wait until the water level recedes.
Lenka arrived. Now the two brothers together!
Lisa and Kate
young chefs
preparation for the Sabbath
Our chefs Violetta and Anya
Installation of window sill and slope
Sasha came to the aid of Semfiropolya and Alex from Artyomovsk